Construction Of Distribution Transformer

1. Project Overview:

This project is constructed by installing transformers to meet the high voltage power supply needs of a certain low-voltage distribution equipment. Transformers are mainly composed of high voltage side, low voltage side, and oil immersed box, which have the function of reducing high voltage energy and providing low voltage energy. This construction plan will provide detailed planning and explanation for the site selection, installation, wiring, and testing of transformers.


2. Construction Preparation:

1. Based on the capacity and characteristics of the transformer, select a suitable site for transformer site selection to ensure that the transformer has sufficient safety distance and ventilation conditions.

2. Check the electrical system of the low-voltage distribution equipment to ensure that it meets the input requirements of the transformer.

3. Choose the necessary transformer equipment and accessories to ensure their quality and reasonable specifications.

4. Arrange a professional construction team to ensure sufficient technical and safety knowledge.


3. Construction Process:

1. Transport the transformer equipment to the construction site to ensure the safety and integrity of the equipment.

2. According to the positions indicated in the construction drawings, carry out the foundation construction of the transformer, including excavation of foundation pits, construction of supports, and pouring of concrete.

3. Install the transformer box and accessories to ensure their correct installation and stability.

4. Carry out transformer wiring work, including cable connections on the high-voltage and low-voltage sides, as well as corresponding grounding work.

5. Immerse the transformer in oil and vacuum it to ensure its normal operation and durability.

6. Conduct insulation and operational tests on transformers to verify their performance and stability.

7. Complete the construction report and relevant documents to ensure the standardization and traceability of the construction process.


4. Construction Requirements:

1. Ensure safety during the construction process, strictly follow safety operating procedures and process requirements.

2. Ensure the quality and duration of construction, carry out construction according to the construction plan, and ensure the smooth progress of the project.

3. Strictly comply with environmental protection requirements to ensure that the impact of construction on the surrounding environment is minimized.

4. Cooperate with the supervision and inspection work of the supervisory unit to ensure the compliance and quality of construction.


5. Construction Risk Control:

1. Conduct a preliminary assessment of potential safety risks during the construction process and develop corresponding safety measures and contingency plans.

2. Provide necessary safety training and technical guidance to construction personnel to ensure they have sufficient safety awareness and skills.

3. Monitor the entire construction site to promptly identify and resolve potential safety hazards.

4. Equip necessary emergency rescue equipment and personnel to respond to the occurrence of emergencies.


In summary, this construction plan details the various stages and processes of transformer construction, ensuring the safety, quality, and timeliness of the construction. During the construction process, corresponding adjustments and management should be made according to the specific situation to ensure the smooth progress of the project.