Power Transformer And Distribution Transformer Manufacturing And Installation
Every detail of the installation of the power transformer and distribution transformer must be taken seriously. If there is a problem with the installation of the power transformer, there will be potential safety hazards during the operation of the power transformer, and then it will face safety problems. The installation steps and main parts of the power transformer are relatively complicated. Today we mainly talk about the installation process and method of the power transformer and distribution transformer bridge lap.
1. The joint does not leave a gap
When installing the bridge, the power transformer installation company should deal with the place where the bridge joint is installed. If there is a gap between the joints, it will not pass the power supply acceptance. When the bridge is installed, the connecting plate is used as the connecting tool, and the anti-loosening treatment should be done when installing the bolts. At the same time, pay attention to installing the brackets at the joints firmly to avoid the increase in the winding of the bridge due to the too large distance.
2. Do a good job of protective blocking
The plugging of the bridge frame can well prevent small animals from entering and causing short-circuit faults. If the plugging is not done or does not meet the acceptance standards, it will be required to rectify within a time limit, which will increase the cost and delay the construction period. Therefore, it is necessary to do a good job of blocking when the bridge is overlapped.
3, in line with technical specifications
Every negligence in the construction of the power transformer installation project may cause serious consequences, so the power installation company should pay attention to the construction in strict accordance with the construction specifications and the requirements of the design drawings when installing the bridge. Only by strictly complying with the construction specifications during the construction stage can there be no problems in the process of acceptance and use.
The bridge connection of the above power transformer and distribution transformer is an important installation detail in the installation of power transformers. The construction and corresponding installation of power transformers must be installed in strict accordance with the above steps, so as to avoid various hidden dangers in safety and make power The transformer can operate safely and smoothly!